Case Study: Pearl Road Auto Parts, Cleveland, Ohio
Posted Dec 31 2012 2:00am
Date: 12/31/2012
In May 2009, the owners of Pearl Road Auto Parts in Cleveland, Ohio, began the installation of a 120-kilowatt refurbished Vestas V20 wind turbine. Construction was completed in September 2009, with the turbine beginning to produce energy in November 2009. Since then, the turbine has produced power to offset energy costs for the fourth-generation family-owned business. Wind Powering America verified the following project facts with Jon Kaplan of Pearlwind.
In May 2009, the owners of Pearl Road Auto Parts in Cleveland, Ohio, began the installation of a 120-kilowatt refurbished Vestas V20 wind turbine. Construction was completed in September 2009, with the turbine beginning to produce energy in November 2009. Since then, the turbine has produced power to offset energy costs for the fourth-generation family-owned business. Wind Powering America verified the following project facts with Jon Kaplan of Pearlwind.