I am on step 3 step 5 of a who knows how many step process. LOL! I am hoping that I can get everything completed by the end of February (that's when the storage cabinet should all be here). I have some new shots of the room in steps 2-5 (step 2 = semi-clean the floor; step 3 = tape out and step 4 = priming and step 5 = painting). I'll post them when I get a chance. I'm waiting for W and A to get back from Lowes to determine if I have time to prime today.
Here's the photos!!
Empty room - YAY (Step 2)


Tape for blue stripe (Step 3)


Priming (Step 4)

Painting (Step 5). I am not sure I love the way the color came out. Above the blue line will all be painted white. Can you tell I don't like to cut in (the still exposed blue on the edge of the kick board)??!! LOL!!


I'm going to FORCE myself to cut in tomorrow. And I need to do another coat of the green. Then two coats of the white. Then we'll see how it looks.
I am on
step 3step 5 of a who knows how many step process. LOL! I am hoping that I can get everything completed by the end of February (that's when the storage cabinet should all be here). I have some new shots of the room in steps 2-5 (step 2 = semi-clean the floor; step 3 = tape out and step 4 = priming and step 5 = painting).I'll post them when I get a chance. I'm waiting for W and A to get back from Lowes to determine if I have time to prime today.Empty room - YAY (Step 2)
Tape for blue stripe (Step 3)
Priming (Step 4)
Painting (Step 5). I am not sure I love the way the color came out. Above the blue line will all be painted white. Can you tell I don't like to cut in (the still exposed blue on the edge of the kick board)??!! LOL!!